Depot Street Redesign Manchester VT

IMG_4953 This study is an update of the Depot Street Corridor Study completed by the Bennington County Regional Commission for the Town in 2014.  It is meant to refine and finalize the recommendations for increasing bicycling and walking conditions along Depot Street in the Town, from the roundabout at Main Street (Route 7A) to the intersection with Richville Road.   Once the updated Conceptual Design is completed, the project will move into the design phase, which will result in construction drawings for actual installation.  The project is expected to move into construction in 2018.

More information on the project can be found on the project page on Depot Street Corridor Vision on Facebook.

To take a look at the alternative endorsed by the Selectboard, Click Here.

To review the Alternatives that are under consideration, take a look at the Alternatives report, available HERE.

The Figures that go with the report are available HERE (for Figures B-1, B-2, and B-3) and HERE (for Figures B-4, B-5, B-6, and B-1).

To take a look at the 2014 Depot Street Corridor Study, Click Here.

To take a look at the recent update of existing conditions, Click Here.